Send this page / Print this page Home / Composites News / Business & Markets
More Composite News
By period
Last week
Last month
Last year
By category
Business & Markets
Products
Applications
Process & Equipment
In Brief
Report
By application sector
Automotive
Aeronautics / Aerospace
Marine / Boatbuilding
Construction / Civil engineering
Railway / Mass transit
Consumer goods
Sports / Leisure
Corrosion resistant products (pipes, tanks, gratings)
Electronics
Wind Energy
Medical
Defence / Security
Appliances / Office equipment
Sanitaryware
Other
By process
Hand lay-up
Spray-up
Sheet Moulding Compounds (SMC)
Bulk Moulding Compounds (BMC)
Casting
Pultrusion
Filament winding
Long Fiber Injection (LFI)
Continuous laminating
Resin Transfer Moulding (RTM)
Eco Resin Transfer Moulding (RTM Eco)
Reinforced / Structural reaction injection (RRIM/SRIM)
Vacuum bag / Autoclave
Other
By product
Thermoset resins
Thermoplastic resins
Glass reinforcements
Carbon reinforcements
Aramid reinforcements
Natural reinforcements
Other reinforcements
Core materials
Adhesives
Additives
Gelcoats
Prepregs
Preforms, Fabrics/tapes or mats / unimpregnated
SMC / BMC
Moulds / Tooling materials
Test / Quality control equipment
Process equipment
Composites parts
Design / Engineering services
Other
Advanced Search
More about this
13 May 2008 - Europe
Airbus changes the delivery schedule of the A380

Airbus has completed the A380 programme review and is now informing customers about changes to its delivery schedule, as announced on May 12, 2008. The review assessed the programme status at the critical juncture of transitioning from low rate "individual" production, so-called Wave 1, to the full serial design and manufacturing process, called Wave 2.
Overall, the recovery programme, initiated in summer 2006, is progressing well. Four aircraft were delivered as planned and are performing very well in airline operations on long-range routes. Seventeen aircraft are in various stages of production, mainly in the wiring installation and system testing phases. Most aircraft earmarked for delivery in 2008 have already flown.
However, the review has also shown that the steep ramp-up planned in 2006 is not fully achievable. Time and resources needed for Wave 1 production aircraft are higher than expected, and this has created some delay in the changeover to Wave 2 with its new design and manufacturing process.
As a result, Airbus plans now for 12 (instead of 13) deliveries in 2008 and
21 (instead of 25) in 2009. Details about the new plan and the further
ramp-up and delivery slots in 2010 and the following years will be discussed with customers in the coming weeks.
The results of this review do not, at this stage, cover the financial impact. The extent of the additional costs will be influenced by the actual production and delivery scenario. This will follow discussions with the customers and a more precise evaluation of the implications of the new delivery schedule for 2010 deliveries and beyond. This will therefore take some more time to determine.
Source : EADS



FILAVATM - Customized Fiber Properties from Tailored production
dark matter composites ltd
Carbon Fabric and Glass Fabric

