Send this page / Print this page Home / Composites News / Business & Markets
More Composite News
By period
Last week
Last month
Last year
By category
Business & Markets
Products
Applications
Process & Equipment
In Brief
Report
By application sector
Automotive
Aeronautics / Aerospace
Marine / Boatbuilding
Construction / Civil engineering
Railway / Mass transit
Consumer goods
Sports / Leisure
Corrosion resistant products (pipes, tanks, gratings)
Electronics
Wind Energy
Medical
Defence / Security
Appliances / Office equipment
Sanitaryware
Other
By process
Hand lay-up
Spray-up
Sheet Moulding Compounds (SMC)
Bulk Moulding Compounds (BMC)
Casting
Pultrusion
Filament winding
Long Fiber Injection (LFI)
Continuous laminating
Resin Transfer Moulding (RTM)
Eco Resin Transfer Moulding (RTM Eco)
Reinforced / Structural reaction injection (RRIM/SRIM)
Vacuum bag / Autoclave
Other
By product
Thermoset resins
Thermoplastic resins
Glass reinforcements
Carbon reinforcements
Aramid reinforcements
Natural reinforcements
Other reinforcements
Core materials
Adhesives
Additives
Gelcoats
Prepregs
Preforms, Fabrics/tapes or mats / unimpregnated
SMC / BMC
Moulds / Tooling materials
Test / Quality control equipment
Process equipment
Composites parts
Design / Engineering services
Other
Advanced Search
More about this
25 Jun 2009 - United States
Boeing postpones 787 first flight

© Boeing
Boeing announced on June 23 that first flight of the 787 Dreamliner will be postponed due to a need to reinforce an area within the side-of-body section of the aircraft.
The need was identified during the recent regularly scheduled tests on the full-scale static test airplane. Preliminary analysis indicated that flight test could proceed this month as planned. However, after further testing and consideration of possible modified flight test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur.
First flight and first delivery will be rescheduled following the final determination of the required modification and testing plan. It will be several weeks before the new schedule is available. The 787 team will continue with other aspects of testing on Airplane #1, including final gauntlet testing and low-speed taxiing. Work will also continue on the other five flight test aircraft and the subsequent aircraft in the production system.
Scott Carson, president and CEO of Boeing Commercial Airplanes said a team of experts has already identified several potential solutions.
"Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localized area requiring reinforcement. Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team," Carson said.
Source : Boeing





Thermwood - First in Cnc Routers
SAHM - The Winding Specialist
Recycle your dirty acetone
A plus Enterprises Ltd.
Vacmobiles.com Limited
Z-LASER Optoelektronik GmbH
Oxford and Cherwell Valley College
CORECORK - is the brand of Amorim Cork Composites for core materials in sandwich construction.
dark matter composites ltd