You are here

Goldwind first batch 11 wind turbines started installation in France

News International-French

14 May 2015

Recently, Goldwind Science & Technology 11 sets GW48 / 750 wind turbine units have started hoist installation in France.

The total installed capacity is 8.25 MW. This is part of the 25 wind turbine order that Goldwind has obtained from France for the first time, which marks the breakthrough that Goldwind achieved again in the European and American market.

Development of Goldwind not only won the recognition from the French local developers. The company has also attracted the French wind power industry's attention. The local wind power industry press Le journal made special reports on the project.

Over the years, Goldwind has always adhered to the steadily push forward on the internationalization development strategy. Goldwind has gradually improve the layout of globalization, and has successfully entered 17 countries of the world six continents and achieve steady development of international business.

The wind power market development in Europe and America has a long history, the threshold of the industry and certification standards are high, technology and business model innovation are changing rapidly. The successful experience in Europe, America, Australia, and other developed markets has fully embodied the Goldwind competitiveness in the international market that position has been gradually strengthened.

Original language Chinese