You are here

News

News International-French

GKN Aerospace wins contract from ArianeGroup for additively manufactured rocket engine turbines
6 Sep 2018
Aerospace

GKN Aerospace wins contract from ArianeGroup for additively manufactured rocket engine turbines

GKN Aerospace will develop and manufacture two full-scale turbines for the Prometheus low-cost re-usable rocket engine demonstrator on liquid oxygen and methane propellants.

Automated laminating cell by Airborne
6 Mar 2018

Automated laminating cell and automated ...

At JEC World 2018 (Paris), Airborne, supplier ...

Mikrosam launches integrated AFP & FW solution for high performance composite parts production
5 Dec 2017

Mikrosam launches integrated AFP & FW ...

The hybrid work cell integrates the advantages ...

Innovation News
9 Sep 2015

Formax celebrates opening of its ...

This centre strengthens the company's ...

Selective tape-laying for cost-effective manufacturing of optimised multi-material components
10 Dec 2014

Selective tape-laying for ...

The aim of the Stellar project is to develop ...

Combined ATL and AFP machines
1 Mar 2013

Combined ATL and AFP machines

JEC Europe 2013 - Mikrosam AD has ...

Maxtronic Multiaxial machine
21 Feb 2013

Maxtronic Multiaxial machine

JEC Europe 2013 - Karlmayer continues to ...

Coriolis Composites and Coriolis Software
14 Feb 2013

Coriolis Composites and Coriolis ...

JEC Europe 2013 - Based in France, ...

Innovation News
12 Feb 2013

Dow presents next-generation advanced ...

JEC Europe 2013 - Polyurethane and ...

VCS-mTorres-ATL.jpg
5 Feb 2013

CGTech announces programming and ...

JEC Europe 2013 - At the JEC ...

Robotic solutions for innovative composite applications
4 Feb 2013

Teknodrom - Robotic solutions for ...

Teknodrom is structured to develop and provide ...

  •  
  • 1 / 3
  • >
  • >>